Scottish Water Data Centre


Project Info

PROJECT

To design, manufacture and install internal, horizontal cooling units, specifically designed to meet the existing locations very limited height and floor space configuration. Because of the floor space limitations, cooling units were ‘piggy-backed’ to deliver the required cooling requirement whilst taking up as little space as possible.

SOLUTION

  • Design, manufacture and install 4 off specially configurated 63kW horizontal cooling units within the height restricted Data Centre
  • Design, manufacture and install further 2 off 19kW cooling units for cooling within the control centre
  • Worked closely with the lead consultant, AECOM
  • Trend IQ3 control system incorporated for complete BMS integrated and remote monitoring
  • G4 pleated filters incorporated within design
  • Fully hermetic digitally controlled compressors
  • E.C. fan technology
  • Automatic direct outside air ‘free-cooling’ configuration as standard