PROJECT
To design, manufacture and install 20 fresh air, direct free cooling, high efficiency units into this ‘next generation’, Tier 3 hosting and colocation facility.
SOLUTION
- Install 20 off, 50kW free cool packaged units within a cold aisle containment solution
- High efficiency cooling solution delivering impressive PUE, energy saving and carbon reduction figures
- Significant capital cost savings using packaged solution
- Energy efficient E C fan technology
- Fully optimised, web enabled, control systems integrated with existing BMS
- Cold aisle containment configuration
- Additional cooling solution provided for Battery Room to maintain effective operation