Reading Data Centre


Project Info

PROJECT

To design, manufacture and install 20 fresh air, direct free cooling, high efficiency units into this ‘next generation’, Tier 3 hosting and colocation facility.

SOLUTION 

  • Install 20 off, 50kW free cool packaged units within a cold aisle containment solution
  • High efficiency cooling solution delivering impressive PUE, energy saving and carbon reduction figures
  • Significant capital cost savings using packaged solution
  • Energy efficient E C fan technology
  • Fully optimised, web enabled, control systems integrated with existing BMS
  • Cold aisle containment configuration
  • Additional cooling solution provided for Battery Room to maintain effective operation
  • Additional supply / extract ventilation system installed within swithgear room where UPS plant is situated