Hampshire Data Centre


Project Info

PROJECT

Full turnkey project comprising the design, manufacture, installation and commissioning of 2 off, externally positioned 8.5kW, direct free cool units together with hot aisle containment configuration. Project also included the removal and repositioning of existing cooling equipment within an adjacent data room.

SOLUTION

  • Design, manufacture, install and commission 2 off, 8.5kW, up-flow, direct outside air free cooling units within a hot aisle containment configuration
  • Due to very tight space constraints, cooling units were designed to be positioned outside of the data centre and were fully weatherproofed
  • Installation also included all associated building works, ductwork, electrics, smoke detection and fire suppression systems
  • Using latest Trend IQ3 control technology, the two new cooling units were interlinked to operate in sync in order to achieve greater energy efficiency
  • Significant capital cost savings using ‘free cooling’ packaged solution
  • N + 1 configuration
  • Energy efficient E.C. fan technology
  • Free cooling available for majority of year